July 6, 2009

The second floor decking is being laid down, electrical, and plumbing being roughed in. The opening in the deck in front of the ironworker is the elevator shaft.

The second floor decking is being laid down, electrical, and plumbing being roughed in. The opening in the deck in front of the ironworker is the elevator shaft.