November 21, 2009

the stage is being painted- next up the rigging will be installed.

the stage is being painted- next up the rigging will be installed.


November 20, 2009

the lobby on the main floor of the new Playhouse on the Square.

the lobby on the main floor of the new Playhouse on the Square.


November 19, 2009

standing on the landing of the lobby stair at the new Playhouse on the Square

standing on the landing of the lobby stair at the new Playhouse on the Square


October 29, 2009

Renovation of the 5 story office building is also a part of this project. It will house many of the theater support spaces and administrative offices. It is really starting to read as “one piece”.

Renovation of the 5 story office building is also a part of this project. It will house many of the theater support spaces and administrative offices. It is really starting to read as “one piece”.


October 28, 2009

The ceiling above the balcony is framed in. This ceiling is angled for acoustical purposes, but it also works to open up the balcony visually.

The ceiling above the balcony is framed in. This ceiling is angled for acoustical purposes, but it also works to open up the balcony visually.


October 27, 2009

The exterior panels are just about all installed (and looking good).

The exterior panels are just about all installed (and looking good).


October 10, 2009

Just about to start cladding the exterior.

Just about to start cladding the exterior.


October 9, 2009

Looking down into the stagehouse. The far masonry wall is the rigging wall, in front of it is the loading gallery (top) and the pinrail gallery (lower). Below you can see an opening through the floor which forms the rigging chase.

Looking down into the stagehouse. The far masonry wall is the rigging wall, in front of it is the loading gallery (top) and the pinrail gallery (lower). Below you can see an opening through the floor which forms the rigging chase.


October 8, 2009

The catwalks have been placed, the CMU walls of the sound and light locks are going in. Next up- interior finishes!

The catwalks have been placed, the CMU walls of the sound and light locks are going in. Next up- interior finishes!


September 10, 2009

The plywood formwork has been removed, the roof steel has been erected, the hangers are being installed for the catwalks - the theater is taking shape

The plywood formwork has been removed, the roof steel has been erected, the hangers are being installed for the catwalks - the theater is taking shape


August 20, 2009

The view down Union Avenue from the landing of the cantilevered stair. The area between the hanger on the left and the framing on the right will be infilled with glazing.

The view down Union Avenue from the landing of the cantilevered stair. The area between the hanger on the left and the framing on the right will be infilled with glazing.


August 17, 2009

Playhouse on the Square really starting to take shape!